Getting your Bearings on the Main Level

Getting your Bearings on the Main Level

Penelope and I spent a morning last week taking measurements of the main floor so that we could finally draw up a floor plan!  (Yes, she helped.  She’s OBSESSED with the tap measure). I didn’t have much luck with any of the fancy pants floor planners, so hopefully you don’t mind my MS Paint version.  At least it’s (mostly) to scale

Kitchen:
– Do something to update those cabinets!

– Enlarge the pass-through to the living space
– Switch out the ancient hood for a microwave/venthood combo
– Tile the floors
– Replace the ceiling fan light monster
– Remove the wall-paper border
– Replace the backsplash
– Paint the walls
– Replace the blinds
– Hang some art

Dining:

– Upgrade the dining table
– Add a storage buffet
– New rug

– Stencil (?) the entry wall
– Hang some art

Living Room:


– Replace the blinds
– Add some lamps
– Floating shelves over wine bar
– Hang art
– Add a plant
– Sew new pillow covers